The design and test data required for a performance test are as follows:

The Cooling Technology Institute sells a little computer program they call "The Cooling Tower Tool Kit". The design data, test data and points from the performance curves are input to the program and it quickly calculates the test tower performance as a percentage of the design water flow the tower would be capable of cooling from the design hot water temperature to the design cold water temperature at the design wet bulb temperature when the fans are pitched to draw design fan hp. The test results can also be determined by cross-plotting the performance curves with a pencil. straight edge and French curves, With some loss of accuracy. It can also be done using MS Excel, but it is time consuming.

Design Water Flow GPM Test Water Flow GPM

Design Hot Water Temp. Test Hot Water Temp.

Design Cold Water Temp. Test Cold Wares Temp

Design Wet Bulb Temp. Test Wet Bulb Temp.

Design Dry Bulb Temp. Test Dry Bulb Temp.

Design Fan Motor hp Test Fan Motor Input KW

Tower Performance Curves Barometric Pressure

Tower Elevation Above Sea Pump Discharge Pressure

Make up Water Flow

Make up Water Temp.

Wind Velocity